Method
You get figures, not an opinion.
Every engagement follows DMAIC, the structured problem-solving method used in Lean Six Sigma. I define the operational defect in measurable terms, establish a baseline, implement the change, and measure the result.
01The five steps
Define, Measure, Analyse, Improve, Control
- 01
Define.
Name the operational defect in terms that can be measured.
- 02
Measure.
Establish the baseline: how the process performs today.
- 03
Analyse.
Map what actually happens and locate where the process breaks.
- 04
Improve.
Implement the change: the written procedure, the handoff, the plan.
- 05
Control.
Measure the result and document the process so the improvement holds.
02The method at work
A trunk show, measured end to end
A completed DMAIC project applied to a Loro Piana textiles trunk show.
client order specification errors.
- 84% → 100%
- 15 of 15
- $94,537
03Same method, both kinds of work
For the weekly routine and the one-night event
For a recurring operation, the method produces written procedures and an onboarding programme. For an event, it produces a run-of-show, a role and handoff structure, and an escalation procedure. The steps are the same: map the sequence, locate the failure points, document the plan.
What would you measure first?
Tell me the error that keeps repeating. That’s where an audit begins.